Construction of 2 new warehouses used for chemical storage
£650,000
The floor within warehouse 1 was flood poured using laser screed method in order to meet strict tolerances required for high bay racking.
Warehouse 2 built using concrete wall panels to house loose raw materials and the floor slab was designed to withstand sulphate attack.